Project:
SÜ Buckower Chausee
Service period:
2019
–
2023
Project client:
Senate Department for the Environment, Transport and Climate Protection
Project volume:
€ 9,558,919
Project description
The “Buckower Chaussee” crosses the DB tracks north of the S-Bahn stop “Buckower Chaussee”. It is two long-distance train tracks of the Berlin - Dresden line (line 6135) and two S-Bahn tracks (line 6035).
The existing rail transition is being replaced with the construction of a new flyover. The new flyover is a 4-field prestressed concrete bridge with the spans of 14 m to 15.40 m.
The abutments and the three wall discs with openings are installed deep in the ground. Ramp structures are connected to the flyover.
Since the flyover runs over a train stop, four staircases have been planned.
Engineering services
- Object planning transport systems
- Detailed Design
- Object planning engineering work
- Detailed Design