Project:
New build B71n, Wedringen bypass

Service period:
2017 – 2027

Project client:
District highway building authority Saxony-Anhalt

Project volume:
€ 39,879,000

Project description

The construction measure includes the construction of Wedringen bypass, in the course of the new build of the federal highway B71 between the planned federal motorway A14 and the town of Haldensleben.

It connects the medium-sized town of Haldensleben and the area to the North West of Haldensleben with the planned federal motorway A14 and the regional centre of Magdeburg.

The new build of the B71n, section Wedringen bypass starts in the location of Haldensleben and ends approx. 600 m after the planned hub between the new B71n and the existing B71.

The planned route will therefore largely run outside of built-up areas.

Seven bridges and two throughflow structures will be rebuilt in the course of the building procedure.

The services of the site management/construction supervision include the complete rebuilding of the civil engineering structures and the traffic facilities, including health and safety coordination, ecological construction supervision and coordination of relocation of lines at the junctions within the town.

Engineering services

  • Site management and on-site construction supervision for transport facilities and engineering structures
  • Special services
  • Health protection and safety coordination